We were given specific instructions and responsibilities to undertake the groundwork preparations, including the excavation, foundation laying, and brickwork, as well as the construction of the reinforced concrete (RC) frame for the project. The site presented numerous challenges, particularly due to its location on the corner of a busy main road. Despite these logistical obstructions, Bela overcome them with professional solutions and the construction continued, which entailed the creation of a traditional RC frame alongside the groundwork and brickwork.